SITA to Drive Expansion at Ghana’s New International Terminal

October 16, 2017

SITA is providing its world-class passenger and baggage processing technology as well as its airport management solutions to Ghana’s new Terminal 3 at Kotoka International Airport in Accra, helping cement the airport’s position as a vital regional hub.

Ghana’s largest airport is expanding its capacity to meet significant growth in international passenger traffic, increasing the airport’s capacity to five-million passengers a year. The country’s aviation industry has witnessed significant growth over the past decade due to the discovery of petroleum and gas reserves, sustained domestic demand and the growth of the tourism sector.

SITA already provides technology for Terminals 1 and 2 at Kotoka International Airport and will ensure that its world-class technology is fully integrated with the existing terminals from day one. This will deliver smooth passenger and baggage processing, and efficient operations across the entire airport.

SITA is deploying its latest passenger processing technology including common use Check-In Desks and Self-Service Check-In Kiosks, allowing the airport to maximize its capacity by enabling airlines to cost-effectively share the same infrastructure.

 

The airport will also make use of SITA’s state of the art Baggage Management technology that will assist airlines in tracking bags every step of the way, helping them meet IATA’s Resolution 753 requirements from day one.

On the operational side, SITA’s Airport Management Solution will simplify planning and operational control, and facilitate collaborative decision-making, data management and analysis in Terminal 3 and across the entire airport. It will also support revenue management with its billing and reporting functionality.

SITA is initially contracted to MAPA during the deployment and implementation phase before handing over to GACL who will then take over the day-to-day running of the terminal.

Kotoka International Airport supports both international and national routes for passenger and cargo aircraft. When Terminal 3 opens at the end of 2017, it will have six contact stands and two remote stands for long-range aircraft, including Airbus A380s, A330s and Boeing 777s and 787s.

Please reload

ET.jpg
AFA_afritraveller_Banner_300X250.jpg
FEATURED POSTS
Please reload

ITB Asia1.jpg
FIHA 2020 - 300x250.jpg
 RELATED POSTS
Please reload

© Copyright 2019 The Afritraveller. All Rights Reserved.

  • White Facebook Icon
  • White Twitter Icon
  • White Google+ Icon
  • White LinkedIn Icon
  • White Pinterest Icon
  • White Instagram Icon
  • White RSS Icon

Get Social: