When the A350-1000 and A330neo enter service as Airbus’ latest jetliner family members, these aircraft will have completed a comprehensive process called the development lifecycle.

 

According to Airbus, the lifecycle’s guiding principle is to provide “key deliverables” at each milestone – which are known as Maturity Gates (MGs), from MG1 to MG15, representing different phases. 

 

The Feasibility Phase

 

Following the establishment of an aircraft’s need in response to market demand, the Feasibility Phase (MG1-MG3) is when the programme's overall objectives and assumptions are defined, and the basic architecture and decision solution rankings are made in response to customer needs. Potential new technologies are chosen, industrial scenarios are examined, and the initial team that will drive development in the Concept Phase is established.

 

The Concept Phase

 

The Concept Phase (MG3-MG5) includes several major decisions, such as validation of aircraft performance targets, selection of the structure and systems architecture, authorisation of resource ramp-ups, and confirmation of the industrial launch. Key deliverables are defined, including the aircraft design, build and component concepts, plus performance and commercial margins. 

 

During this phase, the suppliers are selected. Initially, several potential suppliers competing on the same work packages are co-located with Airbus teams on the programme plateau, all of them working in a fully integrated way, using the same systems, tools and design processes. Once a supplier is chosen for a specific work package, it will continue to work on the plateau during the Joint Definition Phase alongside Airbus and the risk-sharing partners. 

 

The Design Phase and beyond

 

The aircraft truly takes shape in the Design Phase (MG5-MG7), when the overall design and cabin definitions are frozen, the first parts have been made, and all critical design reviews have been passed.

 

This phase also features the bulk of the Industrial and Test Means Development Phases. With the launch of the industrial development phase, the first elements are designed, produced and qualified for the initial aircraft assembly. The manufacturing system – including manufacturing and assembly plants, final assembly line, jigs and tools, testing, transportation, and plant logistics – are prepared and assessed to ensure that the programme will meet its industrial schedule. Furthermore, the testing means – virtual testing and simulators, laboratory benches, static and fatigue test specimens, and flight test instrumentation – are designed and produced.

 

The Final Phase

 

During the final phases (MG7-MG15), the aircraft is built, and intensive tests – including flight trials – are performed in parallel. The objective is to assemble, certify and deliver a fully mature aircraft, starting with the programme's launch customer. At this point series production can begin.

 

To ensure a smooth entry into service, the first operators' pilots and staff train within Airbus facilities, and all the customer support means, tools and documentation are deployed in time for the first airline operations. 

 

Once the processes for industrial production are streamlined and running robustly and operational feedback has been received, the development project is closed and the programme is transformed into the series production mode. The lessons learned are taken and shared with following development projects and the lifecycle begins again.

 

Story by Airbus

Please reload

ET.jpg
Copyof10023-RMBannersAviationMP-300x250.
FEATURED POSTS
Please reload

ITB Asia1.jpg
AHIF 300x250.jpg
 RELATED POSTS
Please reload

© Copyright 2019 The Afritraveller. All Rights Reserved.

  • White Facebook Icon
  • White Twitter Icon
  • White Google+ Icon
  • White LinkedIn Icon
  • White Pinterest Icon
  • White Instagram Icon
  • White RSS Icon

Get Social: